Optimaler Bestellzeitpunkt

Also: Bestellzeitpunkt, Optimaler Bestellpunkt, Nachbestellzeitpunkt, Bestelltrigger, Bestellauslösezeitpunkt

AI-generated

In brief

The optimal reorder point refers to the moment at which a replenishment order must be triggered so that neither stock shortages occur nor unnecessarily high inventory levels are built up. It takes into account replenishment lead time, current stock, and safety stock.

Key facts

What is the optimal reorder point?

The optimal reorder point is the moment in the inventory cycle at which an order should be triggered so that goods arrive in time – that is, before stock falls below a critical level, but without ordering too early and thereby tying up capital unnecessarily. It is not a fixed calendar date; rather, it arises dynamically from the interplay of current inventory levels, projected consumption, replenishment lead time, and safety stock.

How is the reorder point determined in practice?

The most widely used method is reorder point logic: as soon as available stock – meaning inventory on hand plus open inbound quantities minus reserved quantities – reaches or falls below a defined reorder level, an order is triggered automatically. The reorder level is calculated in simplified terms as average daily consumption multiplied by lead time, plus a safety stock buffer that absorbs fluctuations in both consumption and delivery time.

In procurement planning, the following factors also play a role:

  • Planning frequency: Whether planning is carried out daily, weekly, or in real time affects how precisely the reorder point can be hit.
  • Supplier reliability: If replenishment lead times vary significantly, the safety stock – and therefore the reorder level – must be set correspondingly higher.
  • Call-off models and framework agreements: In just-in-time call-offs or Kanban systems, the physical or electronic call-off replaces the traditional reorder point.
  • Reservations and order forecasts: A modern WMS or ERP system should factor open customer orders and production requirements into available stock in order to avoid phantom inventory.

What matters when selecting the right method?

Not every method suits every item. For high-value A-items with predictable consumption, a closely monitored, demand-driven calculation is worthwhile. For low-value C-items with stable consumption, a simple reorder level with a generous safety stock is often sufficient. ABC or XYZ item classification therefore provides a sensible basis for parameter setting.

It should also be noted that the reorder point and order quantity are closely linked: a reorder point triggered too early in combination with large order quantities leads to excess inventory, while a trigger that fires too late causes supply shortages. Both parameters must be optimized together. Which method is more appropriate in any given case depends on the system landscape, data quality, and supplier agreements – blanket recommendations fall short here.

Frequently asked questions

The reorder level is a defined inventory value whose breach triggers the reorder point. The reorder point itself is therefore the event that occurs when the reorder level is reached. The two terms are closely related, but describe different concepts.