Rüstzeit

Also: Rüsten, Setup-Zeit, Umrüstzeit, Rüstaufwand, Rüstvorgänge, Setup time

AI-generated

In brief

Setup time refers to the period required to switch a machine, system, or workstation from a running order to a new order. It is non-productive time and directly affects capacity, batch size, and lead time.

Key facts

What is setup time?

Setup time is the period between the end of the last good unit of one order and the start of the first good unit of the next order. During this phase, neither production nor picking takes place: the system or workstation is reconfigured, cleaned, adjusted, or loaded with new materials. Setup time is therefore a form of non-productive time, yet it is unavoidable whenever different orders, products, or variants run on the same resources.

Setup time in intralogistics and production

In production, setup typically involves tool changes, adjustment of machine parameters, configuration of fixtures, and trial runs until the first defect-free unit is produced. In intralogistics, comparable setup times arise at packaging lines, labelers, palletizers, or manual picking workstations whenever the product format, packaging type, or order profile changes. Even in automated systems such as sorters or conveyor technology, a product changeover may require adjustments to the control system that must be counted as setup time.

Setup times can be divided into two categories:

  • Internal setup: Activities that can only be carried out while the system is at a standstill — for example, physically changing a tool.
  • External setup: Preparatory tasks that can take place in parallel with ongoing operations — for example, staging tools or materials at the workstation.

The goal of the SMED approach (Single Minute Exchange of Die) is to shift as many activities as possible from internal to external setup, thereby minimizing system downtime.

What matters when planning and selecting systems?

Setup times directly influence the optimal batch size: the longer the setup takes, the larger the batches planned, in order to spread setup costs across more units. However, this leads to higher inventory levels and longer lead times. Reducing setup times enables smaller, more frequent production runs — a key lever for flexibility and demand-driven manufacturing.

When evaluating systems and equipment, you should include setup time as a measurable criterion. Relevant factors include the average setup time per product changeover, the number of setups per shift, and whether setups can be shortened through standardization, quick-clamping systems, or software-based recipe management. Vendor claims regarding setup times should be verified during acceptance testing or a pilot operation, as actual setup time depends heavily on the product mix and the skill level of the staff.

Frequently asked questions

Setup time includes all activities required to produce the first good unit of the next order after the last good unit of the previous order. This encompasses tool changes, cleaning, parameter adjustment, material procurement, and trial runs. Travel times or waiting times for materials are recorded differently depending on the operation.