Sekundärbedarf

Also: sekundärer Bedarf, Sekundärbedarfe, abgeleiteter Bedarf, Komponentenbedarf

AI-generated

In brief

Secondary demand refers to the demand for assemblies, individual parts, and semi-finished goods that is mathematically derived from primary demand. The basis for its determination are bills of materials, which specify which components are required to manufacture a finished product.

Key facts

What is secondary demand?

Secondary demand is the quantitative demand for assemblies, individual parts, and semi-finished goods that results directly from primary demand. While primary demand describes the demand for saleable finished products, secondary demand forms the next level of the demand pyramid: it specifies what must be produced internally or procured externally in order for the planned quantity of finished products to be manufactured at all. It must also be distinguished from tertiary demand, which encompasses auxiliary and operating materials such as lubricants or packaging materials that do not directly enter into the finished product.

How is secondary demand determined in practice?

Secondary demand is typically calculated via an MRP run (Material Requirements Planning) in the ERP system. The starting point is the planned production quantities from sales planning or confirmed customer orders. The system resolves these quantities using the stored bills of materials and calculates which components are needed in what quantity and at what time. Existing stock levels and already initiated purchase orders or production orders are offset against this, so that ultimately only the net demand that still needs to be covered is reported.

The quality of master data is critical here: incorrect bill of materials positions, wrong scrap rates, or outdated inventory information lead to incorrect secondary demand quantities and, consequently, to shortages or excess stock. In practice, therefore, close coordination between engineering, production planning, and warehouse management is essential.

  • Bill of materials explosion: Multi-level products require a multi-level explosion, in which assemblies are in turn broken down into their sub-components.
  • Inventory netting: Existing stock levels and open incoming orders are subtracted from gross demand to determine net demand.
  • Scheduling: Order trigger or production start dates are derived from the requirement date and replenishment lead times.

What matters in planning?

For inventory planning, secondary demand is the central driver of stock decisions for C-parts and purchased parts. Knowing secondary demand enables safety stocks to be sized in a targeted manner rather than built up across the board. For purchasing, it provides the basis for supplier scheduling and for the early identification of bottleneck situations.

Depending on the vendor, ERP systems differ in how flexibly they process planning scenarios or multiple bills of materials. The question of whether secondary demand is derived purely deterministically (from orders) or partially stochastically (from forecasts) also varies depending on the industry and production type. In make-to-order production, deterministic explosion predominates; in series production, forecast-based demand is frequently added.

Frequently asked questions

Primary demand refers to the demand for saleable finished products — in other words, what customers buy. Secondary demand is the demand for assemblies and individual parts derived from primary demand that are required to manufacture these finished products. The derivation is carried out via bills of materials in the ERP system.